1 |
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar. |
|
2 |
Supply of Pegtop Mooring System |
|
3 |
Engineering, Procurement, Installation and Commisionning for Navigational Aids to Ras Laffan Port ( Installation of all Navigational Aids, Pollution Control Equipment, Mooring Buoys, Beacons etc..) |
|
4 |
Metocean Data Collection and Monitoring Station for Ras Laffan Port ( Sensors to measure Current, Tide, Wind, Temperature, Pressure, Humidity, Rainfall, Visibility etc..) |
|
5 |
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar. |
|
6 |
Supply of Pegtop Mooring System |
|
7 |
Engineering, Procurement, Installation and Commisionning for Upgrade at PS4 (upgrade works to the offshore living Quarter at North Field Alpha) |
|
8 |
Engineering, Procurement, Installation and Commisionning for Permanent power supply to RLC front and rear leading lights ( Providing UW LV 220V Power supply to front and rear leading lights including underwater cable laying) |
|
9 |
Supply of Weather Sensor for QP ( Wind Direction and Speed Sensor and Monitoring System) |
|
10 |
Supply of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
|
11 |
Supplly of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
|
12 |
Supply of Navigational Aids Spares (Spares for the Navigational Aids in Ras Laffan Port) |
|
13 |
Complete Channel Buoy with Mooring for Qatar Petroleum. |
|
14 |
Engineering, Procurement, Installation and Commisionning for Mesaieed Channel Upgrade (Construction & Installation of 18Nos. Channel Buoys) |
|
15 |
Complete Channel Buoy with Mooring for Qatar Petroleum. |
|
16 |
Supply of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
|
17 |
Supply of Mooring Equipment (Grade U2 Openlink chain, D shackles, Swivels etc. for the Navigational Aids in Ras Laffan Port) |
|
18 |
Supply of Solar Power System ( including Solar panels, Charge regulators, Deep cycle maintenance free batteries etc.) |
|
19 |
Supply of Weather Sensor for ANADARKO Energy Co., Doha Qatar ( Wind Direction and Speed Sensor and Monitoring System) |
|
20 |
Supply, Installation and Commissioning of Pollution Control Equipment at CCWP Pump House No. 2 at RLC |
|
21 |
Engineering, Procurement, Installation and Commissioning for Upgrade of Laundry Equipment on NF-A (PS4) |
|
22 |
Supply of Pegtop Mooring Buoys |
|
23 |
U/W Maintenece and Inspection of QASCO Outfall channel (Underwater cleaning and silt/debris removal from seawater outlet channel of appx. 1Km length and submission of report) |
|
24 |
Removal of Silt and Debri from Seawater Intake and Pipes at Sheraton Hotel Resorts |
|
25 |
Annual Maintanance of Navigational Aids Solar Light System (conduct preventive and emergency maintenance of solar light equipment on all Navigational Aids in the channel) |
|
26 |
Replacement of Navigational Lantern on all QFM channel Buoys (Replacement of all channel buoy light system with new LED lantern) |
|
27 |
Supply, Installation and commissioning of Industrial Kitchen, HVAC and Furniture's for Najadha Restaurant (Installation of heavy duty kitchen equipment, HVAC units, Kitchen Hood & related works) (MMAA) |
|
28 |
Supply and Installation of Navigational buoys at West Bay Lagoon North and South Channel (MMAA) |
|
29 |
3 year contract for Maintenance of Navigational Aids at Doha Channel (MMAA) |
|
30 |
Maintenanace of Nav. Aids at West Bay Lagoon including underwater inspection andcleaning/repair/repelace of parts (MMAA) |
|
31 |
Supply of Nav. Aids for QAFCO 4 Expansion Project |
|
32 |
Supply of 18 Nos 1000Ø Channel Buoys for Mesaieed Port with M/S DRAGOMAR international |
|
33 |
EPIC for Main Flight Information System and PAS |
Dragomar |
34 |
Design, Installation and commissioning of Vessel Traffic Management System & Metocean Data for Doha Port |
|
35 |
Design, Installation and commissioning of 16 Navigational Platforms for Doha Port- offshore |
|
36 |
Supply and installation of Perimeter Safety System |
Al Udeid Airbase |
37 |
Inspection, Cleaning & Desilting of 10 Nos. of Seawater Intake Tank Pipes in AC Lagoon Area |
|
38 |
Removal of Sunken Articulated Beacon |
|
39 |
Modification of Navigational Channel Buoys in Mesaieed Channel |
|
40 |
Supply of Led type Navigational Light |
|
41 |
Supply of Marine Lantern |
|
42 |
Emergency Maintenance of all Channel Buoys at West Bay Lagoon (MMAA) |
|
43 |
Supply of Buoys at Pearl of the Gulf |
Dredging International |
44 |
Dredging of AC Lagoon at Sheraton Doha Hotel & Resort |
|
45 |
Marine Maintenance Works at West Bay Lagoon Package 1: Beach Maintenance and Navigation Aids |
|
46 |
Marine Bathymetric Survey & Diving at QFM Channel & Basin |
|
47 |
Repair of Buoyant Beacon at Doha Port |
Qatar Navigation /Stanford Marine |
48 |
Supply of LED Marine Lantern |
|
49 |
Supply of New Twin Screw Pilot Launch ( 1 No.) |
|
50 |
Supply, installation and Commissioning of Automatic Weather Station at Qatar Meteorological Department |
|
51 |
Supply of Marine Lantern |
|
52 |
Supply of Marine Lantern-For The Pearl Project |
|
53 |
Full Maintenanace of 13 Nav. Aids at QFM Channel |
|
54 |
Supply of Marine Lantern-For Pearl Project |
|
56 |
Supply of Marine Lantern-For Pearl Project |
|
57 |
Supply, Installation and Commissioning of navigation aids channel buoys in Doha Channel |
|
58 |
Dredging of Seawater Intake (AC) Lagoon at Sheraton Doha Hotel & Resort |
|
59 |
Dredging & Silt Removal of Sharq Village & Spa Beach Area |
United Construction Est. Cybarco Ltd. (JV) |
60 |
Supply of 2 nos. articulated Beacon for Doha Port |
|
61 |
Supply of Pegtop Mooring Buoys |
|
62 |
Supply of Marine Lanterns |
|
63 |
Installation of 100 tons Bollards at QFM Jetty |
|
64 |
Supply of Marine Lanterns (Sinohydro Lusail Proj) |
|
65 |
Diving & Inspection of DMS 2000 |
|
66 |
Diving, Inspection & Installation of Marker Buoy at QFM Channel |
|
67 |
Supply of Marine Lanterms |
|
68 |
Removal & Repair of Sunken Buoy at QFM Channel |
|
69 |
Supply of Marine Lanterns |
|
70 |
Fabrication, & Installation of Completely Assembled Buoyant Beacon for Doha Port |
|
71 |
Fabrication,Repair & Installation of Completely Assembled Buoyant Beacon for Doha Port |
|
72 |
Fabrication & Supply of ( 7 sets) Mooring System |
|
73 |
Supply of Marine Lanterns |
|
74 |
Supply of New Twin Screw Pilot Launch (2 Nos.) |
|
75 |
Dismantle/ Remove the Existing Marina Jetty Structures & Fabricate, Supply & Fix New in Place |
|
76 |
Supply of Marine Lanterms |
|
77 |
Fabrication & Supply of ( 2 sets ) Mooring System |
|
78 |
Build & Supply of 65 T Bollard Pull Harbour Tug (2 Units) |
|