| 1 |
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar. |
 |
| 2 |
Supply of Pegtop Mooring System |
 |
| 3 |
Engineering, Procurement, Installation and Commisionning for Navigational Aids to Ras Laffan Port ( Installation of all Navigational Aids, Pollution Control Equipment, Mooring Buoys, Beacons etc..) |
 |
| 4 |
Metocean Data Collection and Monitoring Station for Ras Laffan Port ( Sensors to measure Current, Tide, Wind, Temperature, Pressure, Humidity, Rainfall, Visibility etc..) |
 |
| 5 |
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar. |
 |
| 6 |
Supply of Pegtop Mooring System |
 |
| 7 |
Engineering, Procurement, Installation and Commisionning for Upgrade at PS4 (upgrade works to the offshore living Quarter at North Field Alpha) |
 |
| 8 |
Engineering, Procurement, Installation and Commisionning for Permanent power supply to RLC front and rear leading lights ( Providing UW LV 220V Power supply to front and rear leading lights including underwater cable laying) |
 |
| 9 |
Supply of Weather Sensor for QP ( Wind Direction and Speed Sensor and Monitoring System) |
 |
| 10 |
Supply of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
 |
| 11 |
Supplly of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
 |
| 12 |
Supply of Navigational Aids Spares (Spares for the Navigational Aids in Ras Laffan Port) |
 |
| 13 |
Complete Channel Buoy with Mooring for Qatar Petroleum. |
 |
| 14 |
Engineering, Procurement, Installation and Commisionning for Mesaieed Channel Upgrade (Construction & Installation of 18Nos. Channel Buoys) |
 |
| 15 |
Complete Channel Buoy with Mooring for Qatar Petroleum. |
 |
| 16 |
Supply of Navigational Aids (including supply of solar panels, telemetry boards, Lanterns, etc.) |
 |
| 17 |
Supply of Mooring Equipment (Grade U2 Openlink chain, D shackles, Swivels etc. for the Navigational Aids in Ras Laffan Port) |
 |
| 18 |
Supply of Solar Power System ( including Solar panels, Charge regulators, Deep cycle maintenance free batteries etc.) |
 |
| 19 |
Supply of Weather Sensor for ANADARKO Energy Co., Doha Qatar ( Wind Direction and Speed Sensor and Monitoring System) |
 |
| 20 |
Supply, Installation and Commissioning of Pollution Control Equipment at CCWP Pump House No. 2 at RLC |
 |
| 21 |
Engineering, Procurement, Installation and Commissioning for Upgrade of Laundry Equipment on NF-A (PS4) |
 |
| 22 |
Supply of Pegtop Mooring Buoys |
 |
| 23 |
U/W Maintenece and Inspection of QASCO Outfall channel (Underwater cleaning and silt/debris removal from seawater outlet channel of appx. 1Km length and submission of report) |
 |
| 24 |
Removal of Silt and Debri from Seawater Intake and Pipes at Sheraton Hotel Resorts |
 |
| 25 |
Annual Maintanance of Navigational Aids Solar Light System (conduct preventive and emergency maintenance of solar light equipment on all Navigational Aids in the channel) |
 |
| 26 |
Replacement of Navigational Lantern on all QFM channel Buoys (Replacement of all channel buoy light system with new LED lantern) |
 |
| 27 |
Supply, Installation and commissioning of Industrial Kitchen, HVAC and Furniture's for Najadha Restaurant (Installation of heavy duty kitchen equipment, HVAC units, Kitchen Hood & related works) (MMAA) |
 |
| 28 |
Supply and Installation of Navigational buoys at West Bay Lagoon North and South Channel (MMAA) |
 |
| 29 |
3 year contract for Maintenance of Navigational Aids at Doha Channel (MMAA) |
 |
| 30 |
Maintenanace of Nav. Aids at West Bay Lagoon including underwater inspection andcleaning/repair/repelace of parts (MMAA) |
 |
| 31 |
Supply of Nav. Aids for QAFCO 4 Expansion Project |
 |
| 32 |
Supply of 18 Nos 1000Ø Channel Buoys for Mesaieed Port with M/S DRAGOMAR international |
 |
| 33 |
EPIC for Main Flight Information System and PAS |
Dragomar |
| 34 |
Design, Installation and commissioning of Vessel Traffic Management System & Metocean Data for Doha Port |
 |
| 35 |
Design, Installation and commissioning of 16 Navigational Platforms for Doha Port- offshore |
 |
| 36 |
Supply and installation of Perimeter Safety System |
Al Udeid Airbase |
| 37 |
Inspection, Cleaning & Desilting of 10 Nos. of Seawater Intake Tank Pipes in AC Lagoon Area |
 |
| 38 |
Removal of Sunken Articulated Beacon |
 |
| 39 |
Modification of Navigational Channel Buoys in Mesaieed Channel |
 |
| 40 |
Supply of Led type Navigational Light |
 |
| 41 |
Supply of Marine Lantern |
 |
| 42 |
Emergency Maintenance of all Channel Buoys at West Bay Lagoon (MMAA) |
 |
| 43 |
Supply of Buoys at Pearl of the Gulf |
Dredging International |
| 44 |
Dredging of AC Lagoon at Sheraton Doha Hotel & Resort |
 |
| 45 |
Marine Maintenance Works at West Bay Lagoon Package 1: Beach Maintenance and Navigation Aids |
 |
| 46 |
Marine Bathymetric Survey & Diving at QFM Channel & Basin |
 |
| 47 |
Repair of Buoyant Beacon at Doha Port |
Qatar Navigation /Stanford Marine |
| 48 |
Supply of LED Marine Lantern |
 |
| 49 |
Supply of New Twin Screw Pilot Launch ( 1 No.) |
 |
| 50 |
Supply, installation and Commissioning of Automatic Weather Station at Qatar Meteorological Department |
 |
| 51 |
Supply of Marine Lantern |
 |
| 52 |
Supply of Marine Lantern-For The Pearl Project |
 |
| 53 |
Full Maintenanace of 13 Nav. Aids at QFM Channel |
 |
| 54 |
Supply of Marine Lantern-For Pearl Project |
 |
| 56 |
Supply of Marine Lantern-For Pearl Project |
 |
| 57 |
Supply, Installation and Commissioning of navigation aids channel buoys in Doha Channel |
 |
| 58 |
Dredging of Seawater Intake (AC) Lagoon at Sheraton Doha Hotel & Resort |
 |
| 59 |
Dredging & Silt Removal of Sharq Village & Spa Beach Area |
United Construction Est. Cybarco Ltd. (JV) |
| 60 |
Supply of 2 nos. articulated Beacon for Doha Port |
 |
| 61 |
Supply of Pegtop Mooring Buoys |
 |
| 62 |
Supply of Marine Lanterns |
 |
| 63 |
Installation of 100 tons Bollards at QFM Jetty |
 |
| 64 |
Supply of Marine Lanterns (Sinohydro Lusail Proj) |
 |
| 65 |
Diving & Inspection of DMS 2000 |
 |
| 66 |
Diving, Inspection & Installation of Marker Buoy at QFM Channel |
 |
| 67 |
Supply of Marine Lanterms |
 |
| 68 |
Removal & Repair of Sunken Buoy at QFM Channel |
 |
| 69 |
Supply of Marine Lanterns |
 |
| 70 |
Fabrication, & Installation of Completely Assembled Buoyant Beacon for Doha Port |
 |
| 71 |
Fabrication,Repair & Installation of Completely Assembled Buoyant Beacon for Doha Port |
 |
| 72 |
Fabrication & Supply of ( 7 sets) Mooring System |
 |
| 73 |
Supply of Marine Lanterns |
 |
| 74 |
Supply of New Twin Screw Pilot Launch (2 Nos.) |
 |
| 75 |
Dismantle/ Remove the Existing Marina Jetty Structures & Fabricate, Supply & Fix New in Place |
 |
| 76 |
Supply of Marine Lanterms |
 |
| 77 |
Fabrication & Supply of ( 2 sets ) Mooring System |
 |
| 78 |
Build & Supply of 65 T Bollard Pull Harbour Tug (2 Units) |
 |